Owner's Manual & Assembly Instructions

N01et

Model No.

715750909

Storage Area: 74 Sq. Ft.

6,9 m

BUILDING DIMENSIONS * Size rounded off to the nearest foot

*Approx.

Base

Size

Size

10' x 8'

121" x 92 3/4"

3,0 m x 2,3 m 307,3 cm x 235,6 cm

LW108FB

Missing Parts, Questions on Assembly?

Call: 1-800-851-1085

Do not return to dealer, they are not

equipped to handle your requests.

440 Cu. Ft.

12,5 m

2

3

Exterior Dimensions

(Roof Edge to Roof Edge)

Width

Depth

123 1/4"

95 1/4"

313,1 cm

241,9 cm

CAUTION: SOME PARTS HAVE SHARP EDGES. CARE

MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES

TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ

SAFETY INFORMATION PROVIDED IN THIS MANUAL

BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES

WHEN HANDLING METAL PARTS.

Interior Dimensions

(Wall to Wall)

Height

Width

81 3/8"

118 1/4"

206,7 cm

300,4 cm

Depth

Height

Width

90"

80 1/8"

55 1/2"

228,6 cm

203,5 cm 141,0 cm

Door

Opening

Height

60"

152,4 cm

NextPage
  • 1
  • 2
  • 3
  • 4
  • 5

Advertisem*nt

ARROW LW108FB OWNER'S MANUAL & ASSEMBLY INSTRUCTIONS Pdf Download (2)

Related Manuals for Arrow LW108FB

  • Outdoor storage shed (40 pages)

  • (40 pages)

  • (36 pages)

  • (32 pages)

  • (33 pages)

  • (48 pages)

  • (32 pages)

  • (32 pages)

  • (34 pages)

  • Outdoor storage shed (32 pages)

  • Cl72-a (24 pages)

  • Vm1012-b (35 pages)

  • (35 pages)

  • (35 pages)

  • (45 pages)

  • 10’ x 15’ (32 pages)

Summary of Contents for Arrow LW108FB

  • Page 1 Owner's Manual & Assembly Instructions N01et Model No. LW108FB Missing Parts, Questions on Assembly? Call: 1-800-851-1085 Do not return to dealer, they are not equipped to handle your requests. 715750909 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES Storage Area: 74 Sq.
  • Page 2 We recommend the combined use of an Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground (Available by mail order or at your local dealer) or you may construct a base and anchoring system of your choice.
  • Page 3 PLAN AHEAD..Be sure the day you select to install your building is dry and calm. Watch the Weather: Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Whenever possible, two or more people should work together to assemble Teamwork: your building.
  • Page 4 SAFETY FIRST..Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various •Practice caution with the tools being used in the pieces of your building since some contain assembly of this building. Be familiar with the sharp edges.
  • Page 5 Roof: amounts of snow on roof can damage building making it unsafe to enter. In snow country, Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation. Always keep the door tracks clear of dirt and other debris that prevent them from Doors: sliding easily.
  • Page 6 10'x9' (3,0 m x 2,6 m), use 2 kits. Model No. AT101 Heavy-duty galvanized steel bars that Model No. AK100 fit all 10' (3,0 m) wide Arrow buildings. New concrete anchor system permits They install quickly and easily to anchoring any size Arrow building help organize space and create directly to a concrete slab.
  • Page 7 THIS PAGE LEFT BLANK INTENTIONALLY...
  • Page 8 THIS PAGE LEFT BLANK INTENTIONALLY...
  • Page 9 A. To support a plywood deck B. To be filled with sand. We recommend the combined use of 1. an ARROW FLOOR FRAME KIT and 2. an ARROW ANCHORING KIT as an effective method of securing the building to the ground.
  • Page 10 Below are recommended ways of anchoring. Anchoring into Wood/Post: (Model No. AK4 or 60298) Arrow Anchoring Kit: Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm) Recommended for use with any suggested base. dia. holes provided in the frames for proper anchoring.
  • Page 11 65109 67468 66646 #8-32 Acorn Nut (4) Peak Cap (2) 66045 Washer (373) Handle (2) (Packed with Screws) (Arrow Logo) (10 sheets of 40) 66183 66769 66382 Roof Trim Cap 67545 Door Slide (4) Lower Door Guide (4) (2 right & 2 left)
  • Page 12 Parts List N12et Assembly Part Part Quantity Check Key No. Number Description in Carton List 3719 Door Handle Brace 7332 Wall Panel (Side) 9373 Front Wall Panel 9365 Front Wall Channel 5986 Rear Wall Angle 8576 Right Gable 8577 Left Gable 10497 Horizontal Door Brace 6278...
  • Page 13 Assembly by Key No. N13et...
  • Page 14 ● ● ● ● ● 8934 Ramp (1) ● Parts Needed For ● Step 1 ● ● ● ● ● 9367 Front Floor Frame (2) Floor Frame Assemblies ● ● ● ● ● 8936 Rear Floor Frame (2) ● ● ● ● ● 8937 Side Floor Frame (4) A14hw (13) 9367...
  • Page 15 ● ● ● ● ● 5986 Rear Wall Angle (2) ● Parts Needed For ● ● ● ● ● ● 9917 Rear Wall Channel (2) Step 2 ● ● ● ● ● 9922 Side Wall Channel (4) Frame Assemblies ● ● ● ● ● 8841 Side Wall Angle (4) D15hw Rear Wall Channel 9917...
  • Page 16 ● Parts Needed For ● ● ● ● ● ● 10470 Roof Beam (8) Step 3 Roof Beam Assemblies D16hw (30) 10470 The roof beams join the two gables and support the roof panels. The main roof beam is made up of four pieces 10470 overlapped back to back at the cen- ter.
  • Page 17 ● Parts Needed For ● ● ● ● ● ● 6403 Door Track Splice (1) Step 4 ● ● ● ● ● 9366 Door Track (2) Door Track Assembly A17hw NOTE: Door Track Splice (painted part) 6403 The door track assembly supports the sliding doors and reinforces the front wall.
  • Page 18 ● ● ● ● ● Front Floor Assembly (1) ● Parts Needed For ● Step 5 ● ● ● ● ● Side Floor Assembly (2) Floor Frame ● ● ● ● ● Rear Floor Assembly (1) A18hw RIGHT REAR Assemble the four corners of the 8937 floor frame using two screws at each corner as shown.
  • Page 19 ● Parts Needed For ● ● ● ● ● ● 6515 Wall Panel (2) Step 6 ● ● ● ● ● 9373 Front Wall Panel (2) Corners ● ● ● ● ● 8470 Corner Panel (4) L19hw Narrow Side 8470 (26) Wide Side NOTE...
  • Page 20 ● ● ● ● ● Door Track Assembly (1) ● ● ● ● ● Rear Wall Angle Assembly (1) ● Parts Needed For ● Step 7 ● ● ● ● ● Side Wall Angle Assemblies (2) Frames ● ● ● ● ● Rear Wall Channel Assembly (1) ●...
  • Page 21 ● Parts Needed For ● ● ● ● ● ● 7332 Wall Panel (4) Step 8 ● ● ● ● ● 6515 Wall Panel (4) Wall Panels D21hw STEP 6515 6515 (112) (17) 7332 The wall panels come in two widths. 6515 Each wall panel has a crimped rib on STEP...
  • Page 22 ● Parts Needed For ● ● ● ● ● ● 9369 Door Jamb (2) Step 9 ● ● ● ● ● 9365 Front Wall Channel (2) Front Channel/Door Jamb D22hw 9365 (18) The door jambs reinforce the door STEP opening and provide an attractive trim.
  • Page 23 ● Parts Needed For ● ● ● ● ● ● 8576 Right Gable (2) Step 10 ● ● ● ● ● 8577 Left Gable (2) Gable Assemblies ● ● ● ● ● 6635 Roof Beam Bracket (4) N23et STEP The gables go on top of the front and Edge Trim rear walls to support the roof beams.
  • Page 24 ● ● ● ● ● Left Gable Assemblies (2) ● Parts Needed For ● Step 11 ● ● ● ● ● Right Gable Assemblies (2) Gables/Braces ● ● ● ● ● 9009 Gable Brace (2) N24hw (32) Lift and fasten a right and left gable, under angle at corner, to the door track with screws.
  • Page 25 ● ● ● ● ● Main Roof Beam (1) ● Parts Needed For ● Step 12 ● ● ● ● ● Single Roof Beam (2) Roof Beam/Braces ● ● ● ● ● 9204 Roof Beam Brace (2) N25hw (16) Wrap the weather stripping tape around the two joined edges of the left and right gables.
  • Page 26 ● Parts Needed For ● Step 13 ● ● ● ● ● 8578 Right Roof Panel (1) Right Roof Panel N26et 8578 8579 7571 7571 Installing the roof panels is best done with a step ladder. Begin installing roof panels at the back right corner of 7743 7743 the building.
  • Page 27 ● ● ● ● ● 8578 Right Roof Panel (1) ● Parts Needed For ● ● ● ● ● ● 8579 Left Roof Panel (2) Step 14 ● ● ● ● ● 7571 Roof Panel (2) Roof Assembly ● ● ● ● ● 7743 Roof Panel (2) N27hw STEP STEP...
  • Page 28 ● ● ● ● ● 8840 Ridge Cap (1) ● Parts Needed For ● Step 15 ● ● ● ● ● 7571 Roof Panel (2) Ridge Caps & Panels ● ● ● ● ● 8486 Ridge Cap (1) N28hw 8840 STEP Strips (16)
  • Page 29 ● Parts Needed For ● ● ● ● ● ● 8485 Left Side Roof Trim (2) Step 16 ● ● ● ● ● 8836 Right Side Roof Trim (2) Roof Trim A29hw Attach the right and left side roof trim to the lower end of the roof pan- els on each side of the building using screws at each panel overlap.
  • Page 30 ● ● ● ● ● 3719 Door Handle Brace (2) ● Parts Needed For ● ● ● ● ● ● 10475 Right and Left Doors (2) Step 17 ● ● ● ● ● 10497 Horizontal Door Brace (4) Door Assembly ●...
  • Page 31 ● Parts Needed For ● ● ● ● ● ● Right Door Assembly (1) Step 18 ● ● ● ● ● Left Door Assembly (1) Door Installation & Adjustment A31hw Horizontal Door Brace Gable Door Track Door Slide From inside the building, put the bottom of the right door assembly (on your left when you are inside the building) behind door jamb into the...
  • Page 32 Anchoring and Floor Frame XC32hw Anchoring Anchor your building at this time. Floor Frame If you have purchased a Floor Frame Kit you need to install it at this time.
  • Page 37 SOME FACTS ABOUT RUST XC33hw SOME FACTS ABOUT RUST 1. Avoid nicking or scraping the coating surface, Rusting is a natural oxidizing process that occurs inside and out. when bare metal is exposed to moisture. Problem areas include screw holes, unfinished edges, or 2.
ARROW LW108FB OWNER'S MANUAL & ASSEMBLY INSTRUCTIONS Pdf Download (2024)

FAQs

How long does it take to assemble an arrow shed? ›

There are too many variables which make it difficult to calculate the amount of time needed to assemble a shed. You should plan to devote a full day with another person as a helper to assemble the storage shed after you have selected and constructed the foundation prior to starting.

How to put up a metal storage building? ›

These are the general steps you will need to follow:
  1. Ensure Your Base is Secure. First, make sure that you have a level and secure base for your shed. ...
  2. Construction & Affix the Base Frame. Start by assembling the base frame section by section. ...
  3. Build the Walls. ...
  4. Add in the Roof Frame. ...
  5. Affix Roof Panels. ...
  6. Put the Doors in.
Dec 5, 2022

How much does it cost to assemble a 10x10 shed? ›

Size
Shed Size, In FeetAverage Cost, PrefabAverage Cost, Custom Build
6x6$360–$1,400$1,100–$5,800
8x8$640–$2,600$1,900–$10,200
8x10$800–$3,200$2,400–$12,800
10x10$1,000–$4,000$3,000–$16,000
8 more rows

Do arrow sheds need a foundation? ›

You can choose none at all and just have an earthen floor. Or you can build your own base out of wood or pour your own concrete slab. Or you can buy the Arrow Sheds FDN106 Base Kit for 4'x10', 8'x6' & 10'x6' Arrow sheds or the Arrow Sheds FB106 Floor Frame Kit for 8'x6' & 10'x6' Arrow Sheds .

How to anchor a metal shed to concrete? ›

A Step-by-Step Guide to Anchoring Your Shed to Concrete
  1. Prepare your concrete surface. Prepare your concrete mix according to the manufacturer's instructions. ...
  2. Drill the anchor holes. ...
  3. Install the anchor. ...
  4. Attach the shed to the anchor. ...
  5. Test the stability of the shed.

Can I put a metal shed directly on the ground? ›

When you order your shed, you'll need to decide whether you'll use a shed base kit, a floor frame kit, a concrete slab, or a wood base. You can also put your shed directly on the ground, if you prefer. However, this isn't recommended.

How long does it take to assemble a 6x8 metal shed? ›

Instructions for Assembly

Requires two people and takes 2-3 hours for Installation.

How long does it take to assemble a shed? ›

Assembly varies depending on the size of the shed, whether you have a foundation and number of extensions. Here are some estimates for some of our basic sheds: The 10×8 takes two people 4-5 hours, the 5×3 takes 1 hour, the 4×8 takes 3-4 hours; and the 8×6 takes 2 people 3-4 hours.

How long does it take a professional to put up a shed? ›

Shed Construction

This involves erecting the frame, putting up the walls, and installing the roof. Doors and windows are then fitted after the structural elements are in place. The installation usually takes 2 weeks, but may take longer depending on the size of your shed project.

How long does it take to assemble a lifetime 8x10 shed? ›

Installation typically takes 4-6 hours for this storage shed. Check out the online reviews to see how long it takes most people to do it themselves and what they thought of the process! For us, most installs are completed within a day.

How long does it take to put a Costco shed together? ›

How long does installation typically take? Most sheds are assembled within 1 day.

Top Articles
Latest Posts
Article information

Author: Stevie Stamm

Last Updated:

Views: 5676

Rating: 5 / 5 (80 voted)

Reviews: 87% of readers found this page helpful

Author information

Name: Stevie Stamm

Birthday: 1996-06-22

Address: Apt. 419 4200 Sipes Estate, East Delmerview, WY 05617

Phone: +342332224300

Job: Future Advertising Analyst

Hobby: Leather crafting, Puzzles, Leather crafting, scrapbook, Urban exploration, Cabaret, Skateboarding

Introduction: My name is Stevie Stamm, I am a colorful, sparkling, splendid, vast, open, hilarious, tender person who loves writing and wants to share my knowledge and understanding with you.