ARROW LW1012FB OWNER'S MANUAL & ASSEMBLY INSTRUCTIONS Pdf Download (2024)

ARROW LW1012FB OWNER'S MANUAL & ASSEMBLY INSTRUCTIONS Pdf Download (1)
  1. Manuals
  2. Brands
  3. Arrow Manuals
  4. Outdoor Storage
  5. LW1012FB

Outdoor storage shed

Hide thumbs

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
Table Of Contents 40
  • Contents
  • Table of Contents
  • Bookmarks

Table of Contents

Advertisem*nt

Quick Links

  • 1 Building Dimensions
  • 2 Owner's Manual
  • 3 Parts List
  • Download this manual

Owner's Manual & Assembly Instructions

SR01et

Model No.

715800111

Storage Area: 115 Sq. Ft.

10,7 m

BUILDING DIMENSIONS * Size rounded off to the nearest foot

*Approx.

Base

Size

Size

10' x 12'

121" x 143 1/4"

3,0 m x 3,6 m 307,3 cm x 363,9 cm

LW1012FB

Missing Parts, Questions on Assembly?

Call: 1-800-851-1085 or

assist@arrowsheds.com

Do not return to dealer, they are not

equipped to handle your requests.

686 Cu. Ft.

19,4 m

2

3

Exterior Dimensions

(Roof Edge to Roof Edge)

Width

Depth

123 1/4"

145 3/4"

313,1 cm

370,2 cm

CAUTION: SOME PARTS HAVE SHARP EDGES. CARE

MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES

TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ

SAFETY INFORMATION PROVIDED IN THIS MANUAL

BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES

WHEN HANDLING METAL PARTS.

Interior Dimensions

(Wall to Wall)

Height

Width

81 3/8"

118 1/4"

140 1/2"

206,7 cm

300,4 cm

Depth

Height

Width

80 1/8"

55 1/2"

356,9 cm

203,5 cm

141,0 cm

Door

Opening

Height

60"

152,4 cm

Table ofContents

NextPage
  • 1
  • 2
  • 3
  • 4
  • 5

Advertisem*nt

Table of Contents

ARROW LW1012FB OWNER'S MANUAL & ASSEMBLY INSTRUCTIONS Pdf Download (2)

Related Manuals for Arrow LW1012FB

  • Outdoor storage shed (37 pages)

  • (40 pages)

  • (36 pages)

  • (32 pages)

  • (33 pages)

  • (48 pages)

  • (32 pages)

  • (32 pages)

  • (34 pages)

  • Outdoor storage shed (32 pages)

  • Cl72-a (24 pages)

  • Vm1012-b (35 pages)

  • (35 pages)

  • (35 pages)

  • (45 pages)

  • 10’ x 15’ (32 pages)

Summary of Contents for Arrow LW1012FB

  • Page 1 Owner's Manual & Assembly Instructions SR01et Model No. LW1012FB Missing Parts, Questions on Assembly? Call: 1-800-851-1085 or assist@arrowsheds.com Do not return to dealer, they are not equipped to handle your requests. 715800111 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES Storage Area: 115 Sq.
  • Page 2 We recommend the combined use of an Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground (Available by mail order or at your local dealer) or you may construct a base and anchoring system of your choice.
  • Page 3 PLAN AHEAD..Be sure the day you select to install your building is dry and calm. Watch the Weather: Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Whenever possible, two or more people should work together to assemble Teamwork: your building.
  • Page 4 SAFETY FIRST..Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various •Practice caution with the tools being used in the pieces of your building since some contain assembly of this building. Be familiar with the sharp edges.
  • Page 5 Roof: amounts of snow on roof can damage building making it unsafe to enter. In snow country, Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation. Always keep the door tracks clear of dirt and other debris that prevent them from Doors: sliding easily.
  • Page 6 10'x9' (3,0 m x 2,6 m), use 2 kits. Model No. AT101 Heavy-duty galvanized steel bars that Model No. AK100 fit all 10' (3,0 m) wide Arrow buildings. New concrete anchor system permits They install quickly and easily to anchoring any size Arrow building help organize space and create directly to a concrete slab.
  • Page 7 THIS PAGE LEFT BLANK INTENTIONALLY...
  • Page 8 THIS PAGE LEFT BLANK INTENTIONALLY...
  • Page 9 A. To support a plywood deck B. To be filled with sand. We recommend the combined use of 1. an ARROW FLOOR FRAME KIT and 2. an ARROW ANCHORING KIT as an effective method of securing the building to the ground.
  • Page 10 Below are recommended ways of anchoring. Anchoring into Wood/Post: (Model No. AK4 or 60298) Arrow Anchoring Kit: Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm) Recommended for use with any suggested base. dia. holes provided in the frames for proper anchoring.
  • Page 11 65109 67468 66646 66045 #8-32 Acorn Nut (4) Peak Cap (2) Washer (445) Handle (2) (Packed with Screws) (Arrow Logo) (12 sheets of 40) 66183 66769 66382 Roof Trim Cap 67545 Door Slide (4) Lower Door Guide (4) (2 right & 2 left)
  • Page 12 Parts List SR12et Assembly Part Part Quantity Check Key No. Number Description in Carton List 8576 Right Gable 8577 Left Gable 10497 Horizontal Door Brace 7743 Roof Panel 9086 Right Roof Panel 9087 Left Roof Panel 10475 Right and Left Doors 9369 Door Jamb 9373...
  • Page 13 Assembly by Key No. SR13et...
  • Page 14 ● ● ● ● ● 8934 Ramp (1) ● Parts Needed For ● ● ● ● ● ● 9367 Front Floor Frame (2) Step 1 ● ● ● ● ● 8936 Rear Floor Frame (2) Floor Frame Assemblies ● ● ● ● ● 10392 Side Floor Frame (4) SV14hw (13) 9367...
  • Page 15 ● ● ● ● ● 5986 Rear Wall Angle (2) ● Parts Needed For ● ● ● ● ● ● 10389 Rear Wall Channel (2) Step 2 ● ● ● ● ● 10390 Side Wall Channel (4) Frame Assemblies ● ● ● ● ● 10394 Side Wall Angle (4) SR15hw Rear Wall Channel 10389...
  • Page 16 ● Parts Needed For ● Step 3 ● ● ● ● ● 10397 Roof Beam (8) Roof Beam Assemblies SV16hw (30) 10397 The roof beams join the two gables and support the roof panels. The main 10397 roof beam is made up of four pieces overlapped back to back at the cen- ter.
  • Page 17 ● Parts Needed For ● ● ● ● ● ● 6403 Door Track Splice (1) Step 4 ● ● ● ● ● 9366 Door Track (2) Door Track Assembly A17hw NOTE: Door Track Splice (painted part) 6403 The door track assembly supports the sliding doors and reinforces the front wall.
  • Page 18 ● ● ● ● ● Front Floor Assembly (1) ● Parts Needed For ● Step 5 ● ● ● ● ● Side Floor Assembly (2) Floor Frame ● ● ● ● ● Rear Floor Assembly (1) SW18hw RIGHT Assemble the four corners of the REAR 10392 floor frame using two screws at each...
  • Page 19 ● Parts Needed For ● ● ● ● ● ● 6515 Wall Panel (2) Step 6 ● ● ● ● ● 9373 Front Wall Panel (2) Corners ● ● ● ● ● 6514 Corner Panel (4) SR19hw Narrow Side (38) 6514 Wide Side NOTE...
  • Page 20 ● Parts Needed For ● Step 7 ● ● ● ● ● Rear Wall Channel Assembly (1) ● ● ● ● ● Side Wall Channel Assembly (2) Mid Frames SR20hw (24) The mid frame pieces give rigidity to the side and rear walls. Fasten the rear wall channel across the middle of the rear wall using screws.
  • Page 21 ● ● ● ● ● Door Track Assembly (1) ● Parts Needed For ● Step 8 ● ● ● ● ● Rear Wall Angle Assembly (1) Top Frames ● ● ● ● ● Side Wall Angle Assembly (2) SR21hw (30) The top frame pieces give rigidity to the walls and provide a surface for attaching the gables which support...
  • Page 22 ● Parts Needed For ● Step 9 ● ● ● ● ● 6515 Wall Panel (8) Wall Panels SR22hw STEP (116) (13) Crimped Rib STEP Each wall panel has a crimped rib on Underneath one side. The crimped rib should go under the rib of the panel that follows 6515 Detail Showing...
  • Page 23 ● Parts Needed For ● ● ● ● ● ● 9369 Door Jamb (2) Step 10 ● ● ● ● ● 9365 Front Wall Channel (2) Front Channel/Door Jamb SO23hw 9365 (18) STEP The door jambs reinforce the door opening and provide an attractive INSIDE OF trim.
  • Page 24 ● Parts Needed For ● ● ● ● ● ● 8576 Right Gable (2) Step 11 ● ● ● ● ● 8577 Left Gable (2) Gable Assemblies ● ● ● ● ● 6635 Roof Beam Bracket (4) SR24et STEP Edge Trim The gables go on top of the front and (plastic piece) rear walls to support the roof beams.
  • Page 25 ● ● ● ● ● Left Gable Assemblies (2) ● Parts Needed For ● Step 12 ● ● ● ● ● Right Gable Assemblies (2) Gables/Braces ● ● ● ● ● 9009 Gable Brace (2) SR25hw (32) Lift and fasten a right and left gable, under angle at corner, to the door track with screws.
  • Page 26 ● Parts Needed For ● ● ● ● ● ● Roof Beam Assemblies (3) Step 13 ● ● ● ● ● 9204 Roof Beam Brace (2) Roof Beam//Braces SR26hw (16) Wrap the weather stripping tape STEP around the two joined edges of the left and right gables.
  • Page 27 ● Parts Needed For ● Step 14 ● ● ● ● ● 9086 Right Roof Panel (1) Right Roof Panel SR27et 9087 9086 7743 7743 Installing the roof panels is best done with a step ladder. Install the first roof 7743 7743 panel at the back right corner of the...
  • Page 28 ● Parts Needed For ● ● ● ● ● ● 9087 Left Roof Panel (1) Step 15 ● ● ● ● ● 7743 Roof Panel (2) Ridge Cap & Panels ● ● ● ● ● 6869 Ridge Cap (1) SR28hw (12) (24) Screws To...
  • Page 29 ● Parts Needed For ● ● ● ● ● ● 7743 Roof Panel (2) Step 16 ● ● ● ● ● 6868 Ridge Cap (1) Ridge Cap & Panels SR29hw (16) Install the second ridge cap 6868 overlapping the first ridge cap while installing two roof panels 7743.
  • Page 30 ● ● ● ● ● 6869 Ridge Cap (1) ● Parts Needed For ● ● ● ● ● ● 7743 Roof Panel (2) Step 17 ● ● ● ● ● 9087 Left Roof Panel (1) Ridge Cap & Panels ● ● ● ● ● 9086 Right Roof Panel (1) SR30hw (22) (72)
  • Page 31 ● Parts Needed For ● Step 18 ● ● ● ● ● 6015 Side Roof Trim (4) Roof Trim ● ● ● ● ● 6014 Side Roof Trim (2) SQ31hw Attach the side roof trim pieces to the lower end of the roof panels on each side of the building using screws at each panel overlap.
  • Page 32 ● ● ● ● ● 3719 Door Handle Brace (2) ● Parts Needed For ● ● ● ● ● ● 10475 Right and Left Doors (2) Step 19 ● ● ● ● ● 10497 Horizontal Door Brace (4) Door Assembly ●...
  • Page 33 ● Parts Needed For ● ● ● ● ● ● Right Door Assembly (1) Step 20 ● ● ● ● ● Left Door Assembly (1) Door Installation & Adjustment SQ33hw Horizontal Door Brace Gable Door Track Door Slide From inside the building, put the bottom of the right door assembly (on your left when you are inside the building) behind door jamb into the...
  • Page 34 Anchoring and Floor Frame XA34hw Anchoring Anchor your building at this time. Floor Frame If you have purchased a Floor Frame Kit you need to install it at this time.
  • Page 38 Sheet #2 48“ x 76 1/2” Platte 2 * Hoja núm. 2 Sheet #1 * Panneau n 121.9 cm x 194.3 cm 48“ x 78 3/4” ES1014 & 697.68740 Platte 1 * Hoja núm. 1 48” x 75 9/16” * Panneau n 121.9 cm x 200 cm 121.9 cm x 191.9 cm Sheet #5...
  • Page 39 SOME FACTS ABOUT RUST XA35hw SOME FACTS ABOUT RUST 1. Avoid nicking or scraping the coating surface, Rusting is a natural oxidizing process that occurs inside and out. when bare metal is exposed to moisture. Problem areas include screw holes, unfinished edges, or 2.
ARROW LW1012FB OWNER'S MANUAL & ASSEMBLY INSTRUCTIONS Pdf Download (2024)

FAQs

How long does it take to assemble an arrow shed? ›

There are too many variables which make it difficult to calculate the amount of time needed to assemble a shed. You should plan to devote a full day with another person as a helper to assemble the storage shed after you have selected and constructed the foundation prior to starting.

Why are the holes in my arrow shed not lining up? ›

Holes in roof panels do not line up with the holes in the roof beam and side wall angles. Building is out of square- may be in square at bottom but not at top. If building is out of square, rack and push the shed until it falls back in square. Also loosen the roof panels to give more play and flexibility.

Are arrow sheds easy to assemble? ›

Arrow Storage Products metal sheds are designed to be easily assembled and installed as a DIY project. However, the easiest of tasks can sometimes be daunting to the most seasoned shed installers, no matter how many times they go over the instructions.

How do I stop water coming under my shed wall? ›

Installing an aluminium angle around the perimeter should help prevent water ingress under the walls. You might also like to consider installing a raised floor: How to install a shed floor. However, it's important to first prevent water from entering under the walls as it could cause the early onset of timber decay.

How do I fix the gaps in my shed? ›

Sealant. For a small investment you can also treat the walls and roof of your shed with a wood-based sealant. Applied with an easy to use gun, sealantwill fill in any cracks or holes between slats of wood, preventing cold winds or moisture from entering the shed.

How long does it take to assemble a shed? ›

Assembly varies depending on the size of the shed, whether you have a foundation and number of extensions. Here are some estimates for some of our basic sheds: The 10×8 takes two people 4-5 hours, the 5×3 takes 1 hour, the 4×8 takes 3-4 hours; and the 8×6 takes 2 people 3-4 hours.

How long does it take a professional to put up a shed? ›

Shed Construction

This involves erecting the frame, putting up the walls, and installing the roof. Doors and windows are then fitted after the structural elements are in place. The installation usually takes 2 weeks, but may take longer depending on the size of your shed project.

How long does it take to assemble a lifetime 8x10 shed? ›

Installation typically takes 4-6 hours for this storage shed. Check out the online reviews to see how long it takes most people to do it themselves and what they thought of the process! For us, most installs are completed within a day.

How long does it take to put a Costco shed together? ›

How long does installation typically take? Most sheds are assembled within 1 day.

Top Articles
Latest Posts
Article information

Author: Errol Quitzon

Last Updated:

Views: 5674

Rating: 4.9 / 5 (79 voted)

Reviews: 86% of readers found this page helpful

Author information

Name: Errol Quitzon

Birthday: 1993-04-02

Address: 70604 Haley Lane, Port Weldonside, TN 99233-0942

Phone: +9665282866296

Job: Product Retail Agent

Hobby: Computer programming, Horseback riding, Hooping, Dance, Ice skating, Backpacking, Rafting

Introduction: My name is Errol Quitzon, I am a fair, cute, fancy, clean, attractive, sparkling, kind person who loves writing and wants to share my knowledge and understanding with you.